Motorists are advised of changed traffic conditions from August 18 on Mittagong Road, Bowral for maintenance work.
Subscribe now for unlimited access.
$0/
(min cost $0)
or signup to continue reading
Work will include pavement crack sealing on Mittagong Road between Oxley Drive and Kirkham Street.
To minimise the impact to motorists work will be carried out at night between 7pm and 4am from Sunday 18 to Tuesday 20 August, weather permitting.
Traffic control, lane closures, and a reduced speed limit of 40 km/h will be in place for the safety of workers and motorists.
Motorists are advised to check electronic message boards for updates, allow an additional five minutes travel time, to drive to the conditions and follow the direction of signs and traffic control.
Transport for NSW thanks motorists for their patience during this time.
For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.
READ ALSO: